RC-6 is an exploited rig includes under frame, berth, pile, conductor pipe. It is owned by VSP. The total of weight is near 2000 tons. It is manufactured within 100 days, and will be finished on 10/6/2011. Then it is set in Dragon field.
RC-6 is stable rig in Dragon field, which is chosen a priority construction of Petrovietnam. The rig is urgently manufactured onshore, and connected up onshore for operating in October 2011 to maintain oil capacity of Petrovietnam in general and VSP in particular.
PVC-MS