Typical projects implemented by the PVC-MS from 2006 to 2010
Posted date:19/01/2017

Numerical Order
Project Name
Unit
Volume
Time for Implementing
Customers
1
Categories of construction steel structure for the combined cycle power plant in Nhon Trach 2
Ton
m2
1.031
14.000
2010
Project management board of Nhon Trach II
2
Fabrication, assembly and paint corrosion Ursa Jackets - Mine Development Project Phase II Ursa
Ton
m2
6.244
4.331
2009-2010
Đai Hung Oil Company
3
Fabrication, assembly and paint corrosion Jackets and lightweight truss superstructure block BK-15
Ton
m2
2.130
12.500
2009-2010
VSP
4
Fabrication, assembly and paint corrosion Jackets and Block RC-3 rig superstructure Open
Ton
m2
2.250
15.678
2009-2010
VSP
5
Provide prestressed concrete piles Building Nhon Trach power plant II
m
22.964
2009-2010
 
6
Equipment installation and fabrication, installation of piping connection technology of the upper truss RC Block-5 Extension
system
1
2009
VSP
7
Execution, construction and equipment installation works, "Expansion of petroleum in Can Tho"
Tub with
10.000 m3
4
2009-2010
PV OIL
8
Fabrication, assembly and paint the upper Corrosion Block, Airport and RC-5 truss Fakel Open
Ton
m2
623
15.454
2009
VSP
9
Fabrication, assembly and painting rig corrosion RC-DM base, Rong oil-mine
Ton
m2
1.721
6.707
2009
VSP
10
Fabrication, assembly and painting rig base corrosion RC-5, Rong oil-mine
Ton
m2
1720
5663
2009
VSP
11
Construction Categories Civil Steel Structure Work for Control Room and Plastic Polypropylene Plant Project Dung Quat
Ton
m2
1.679
27.233
2009
PetroVietnam
12
Fabrication, assembly and corrosion resistant coating base, the project Su Tu Den North East
Ton
m2
3.297
2.140
2008-2009
Cuu Long JOC
13
3 Silo installation and transportation of compressed air systems
female
3
2008
TPC-VINA
14
Manufacturing, connecting pipes and carry out work for the installation of electrical equipment, automation at the rig CNTT3-Gold Project Tuna
item
1
2008
VSP
15
Fabrication, installation of oil storage tanks 25,000 m3
female
2
2008
PV OIL
16
Fabrication, assembly and paint the upper storey block corrosion – Phuong Dong Project
Ton
m2
500
7.920
2007-2008
JPVC
17
Manufacturing, assembling and painting the base corrosion, bridge, girder truss bearing housing LQ-10, BK-10
Ton
m2
800
10.020
2007
VSP
18
Manufacturing base – Ca Ngu Vang Development Project
Ton
m2
1.875
1.700
2007
VSP
19
Fabrication and corrosion protection for cooling water systems - Dung Quat oil refinery
Ton
m2
1.435
2.800
2006
Project Management Board of Dung Quat oil refinery
20
Steel Pipe Fabrication Φ609.6mm - Port of products, projects Dung Quat oil refinery
ton
5000
2006
Project Management Board of Dung Quat oil refinery
21
Combination of pipeline installation on the banks of the EPC package - Ca Mau project PM3 (non-tube 457 x 07/12)
km
15km and 2 control station
2006
Project Management Board Ca Mau Gas Power
Relative articles

Signing Contract & Firstcut Ceremony

PVC-MS starts construction the package of SRU / Inakl / Amine Complex area in Nghi Son Refinery & Petrochemical Complex Project

Construction of biggest jacket for oil rig of Viet Nam

PVC-MS starts installation of steel structure in Turbine and Main Control Building of Thai Binh 2 Thermal Power Plant Project

PVC-MS completed manufacturing of jacket of Daihung 2 oil rig

Fisrt Cut ceremony of steel structure for turbine building and main control building package - Thai Binh 2 Thermal Power plant Project

Fabrication, assembly and anti-corrosion for sutuden - Northeast project

Successful load-out of Thang Long Jacket

Kick off BK Thien Ung Platform’s jacket

The “First cut” cermony for TGT H5 WHP jacket and drilling wellbay module 1 project