Numerical Order
|
Project Name
|
Unit
|
Volume
|
Time for Implementing
|
Customers
|
1
|
Categories of construction steel structure for the combined cycle power plant in Nhon Trach 2
|
Ton
m2
|
1.031
14.000 |
2010
|
Project management board of Nhon Trach II
|
2
|
Fabrication, assembly and paint corrosion Ursa Jackets - Mine Development Project Phase II Ursa
|
Ton
m2
|
6.244
4.331 |
2009-2010
|
Đai Hung Oil Company
|
3
|
Fabrication, assembly and paint corrosion Jackets and lightweight truss superstructure block BK-15
|
Ton
m2
|
2.130
12.500 |
2009-2010
|
VSP
|
4
|
Fabrication, assembly and paint corrosion Jackets and Block RC-3 rig superstructure Open
|
Ton
m2
|
2.250
15.678 |
2009-2010
|
VSP
|
5
|
Provide prestressed concrete piles Building Nhon Trach power plant II
|
m
|
22.964
|
2009-2010
|
|
6
|
Equipment installation and fabrication, installation of piping connection technology of the upper truss RC Block-5 Extension
|
system
|
1
|
2009
|
VSP
|
7
|
Execution, construction and equipment installation works, "Expansion of petroleum in Can Tho"
|
Tub with
10.000 m3
|
4
|
2009-2010
|
PV OIL
|
8
|
Fabrication, assembly and paint the upper Corrosion Block, Airport and RC-5 truss Fakel Open
|
Ton
m2
|
623
15.454 |
2009
|
VSP
|
9
|
Fabrication, assembly and painting rig corrosion RC-DM base, Rong oil-mine
|
Ton
m2
|
1.721
6.707 |
2009
|
VSP
|
10
|
Fabrication, assembly and painting rig base corrosion RC-5, Rong oil-mine
|
Ton
m2
|
1720
5663 |
2009
|
VSP
|
11
|
Construction Categories Civil Steel Structure Work for Control Room and Plastic Polypropylene Plant Project Dung Quat
|
Ton
m2
|
1.679
27.233 |
2009
|
PetroVietnam
|
12
|
Fabrication, assembly and corrosion resistant coating base, the project Su Tu Den North East
|
Ton
m2
|
3.297
2.140 |
2008-2009
|
Cuu Long JOC
|
13
|
3 Silo installation and transportation of compressed air systems
|
female
|
3
|
2008
|
TPC-VINA
|
14
|
Manufacturing, connecting pipes and carry out work for the installation of electrical equipment, automation at the rig CNTT3-Gold Project Tuna
|
item
|
1
|
2008
|
VSP
|
15
|
Fabrication, installation of oil storage tanks 25,000 m3
|
female
|
2
|
2008
|
PV OIL
|
16
|
Fabrication, assembly and paint the upper storey block corrosion – Phuong Dong Project
|
Ton
m2
|
500
7.920 |
2007-2008
|
JPVC
|
17
|
Manufacturing, assembling and painting the base corrosion, bridge, girder truss bearing housing LQ-10, BK-10
|
Ton
m2
|
800
10.020 |
2007
|
VSP
|
18
|
Manufacturing base – Ca Ngu Vang Development Project
|
Ton
m2
|
1.875
1.700 |
2007
|
VSP
|
19
|
Fabrication and corrosion protection for cooling water systems - Dung Quat oil refinery
|
Ton
m2
|
1.435
2.800 |
2006
|
Project Management Board of Dung Quat oil refinery
|
20
|
Steel Pipe Fabrication Φ609.6mm - Port of products, projects Dung Quat oil refinery
|
ton
|
5000
|
2006
|
Project Management Board of Dung Quat oil refinery
|
21
|
Combination of pipeline installation on the banks of the EPC package - Ca Mau project PM3 (non-tube 457 x 07/12)
|
km
|
15km and 2 control station
|
2006
|
Project Management Board Ca Mau Gas Power
|