PVC-MS successfully erect Moc Tinh’s panel Row 2
16/05/2011
On 13 May, PVC- MS and Vietsovpetro have successfully erected Moc Tinh Rig’s panel row 2. This event marks the completion of construction the panel by constructor Petroleum Equipment Assembly & Metal Structure Joint Stock Company (PVC-MS, Hose Code: PXS)
PVC - MS push for for faster construction of Metal Fabrication port project 23 ha
12/05/2011
Metal fabrication port project 23 ha at the Sao Mai - Ben Dinh marine services base is a key project in 2011 invested by Petroleum Equipment Assembly & Metal Structure Joint Stock Company (PVC- MS, Hose Code: PXS).
PVC-MS implement labor policies
26/04/2011
Petroleum Equipment Assembly & Metal Structure Joint Stock Company (PVC-MS) has been high appreciated by BRVT Inter-branch Inspection Team about the observance of labor laws and workplace safety, after the team periodically inspection this content with the company on 04/25/2011.
PVC-MS completed manufacturing of jacket of Daihung 2 oil rig
18/04/2011
After 16 months, Petroleum Equipment Assembly & Metal Structure Joint Stock Company ((PVC- MS, code PXS, HoSE) has completed manufacturing of jacket of Daihung 2 oil rig, on 16 April 2011. It is the biggest jacket was first built in Viet Nam. This rig is owned by PVEP Daihung; Vietsovpetro is general constructor and PVC-MS is jacket manufacturing constructor.
PVC-MS successfully organized football "PVC-MS Spring"
09/03/2011
Petroleum Equipment Assembly & Metal Structure Joint Stock Company PVC-MS has successfully organized football cup competition, "PVC-MS Spring" in 2011, from 23/02/2011 to 04 / 03/2011.
PVC-MS worked with foreign investor
08/03/2011
On February 28th, 2011, McDermott Asia Pacific Inc’s senior executives visited and had the meeting with PVC-MS’s leaders (Stock Code: PXS).
PVC-MS training labor safety, sanitation & fire prevention - fighting
26/02/2011
Petroleum Equipment Assembly & Metal Structure Joint Stock Company (PVC-MS, Hose code: PXS) organize training labor safety, sanitation and fire prevention & fighting in 2011, during the days 19/2/2011, 26/2/2011, 27/2/2011, 05/3/2011. More than 1500 staff members of the Company attended the training course.
First cut Ceremony RC 6
26/02/2011
On 14 January 2011, at VSP Port, Petroleum Equipment Assembly & Metal Structure Joint Stock Company (PVC-MS, Code: PXS, HoSE) with a sub contractor role, has organized the first cut ceremony of RC-6 under frame.