Bidding package "Fabrication of Dai Hung 01 wellhead platform topside block" for PVEP
Project introduction
This is a part of the Đại Hùng Field Development Project – Phase 3, Block 05.1a, with Vietsovpetro as the EPC contractor.
PVC-MS is responsible for fabricating the wellhead platform topside with a total weight of 1,416 tons and an estimated value of about 200 billion VND.
Construction began in March 2023 and was handed over to the EPC contractor Vietsovpetro in May 2024.
Image gallery
Other projects
PVC-MS commences the Base Fabrication Package for the Greater Changhua Offshore Wind Power Project
Vietnam
920 MW
August 14, 2023
Package A2 of Long Son Petrochemical Complex Project, investor SCG Thailand
Vietnam
464ha of land
2018
Bidding package "Installation of steel structures, installation of machinery and equipment, fabrication and installation of technological pipes in the Sru/Inakl/Amine area (SMP1B)"
Vietnam
5,000 tons
12/2014
Thai Binh 2 Thermal Power Project invested by PVN Group
Vietnam
41,000 billion VND
12/2023
PVC-MS completed and handed over 2 JA and KA pedestals of the JA&KA Gallaf 3 Footing Project
Vietnam
4350 ton
April 1, 2023
PVC-MS started construction of the DH01 Wellhead Platform Topside Fabrication Package
Vietnam
March 14, 2023
0/5
(0 nhận xét)
5
0% | 0 comments
4
0% | 0 comments
3
0% | 0 comments
2
0% | 0 comments
1
0% | 0 comments
Chia sẻ nhận xét về sản phẩm
Gửi nhận xét
GỬI ĐÁNH GIÁ CỦA BẠN
Đánh giá
Gửi
Liên hệ khi có hàng "Bidding package "Fabrication of Dai Hung 01 wellhead platform topside block" for PVEP"
Email
*
Email is required
Email not valid
Phone number
*