Bidding package "Fabrication of Dai Hung 01 wellhead platform topside block" for PVEP
Project introduction
- This is a part of the Đại Hùng Field Development Project – Phase 3, Block 05.1a, with Vietsovpetro as the EPC contractor.
- PVC-MS is responsible for fabricating the wellhead platform topside with a total weight of 1,416 tons and an estimated value of about 200 billion VND.
- Construction began in March 2023 and was handed over to the EPC contractor Vietsovpetro in May 2024.